6 days4 Days Mount Kenya Climbing Package
Length
4 days
Itinerary
4 days planned
Group
Private
Guides
German, English
Overview
4 Days Mount Kenya Climbing Naro Moru Route Package is taken by many of the trekkers who try to reach Point Lenana. 4 Days Mount Kenya Climbing Naro Moru Route Package can be ascended in only 3 days and has bunkhouses at each camp so a tent is not necessary. The terrain is usually good, although one section is called the Vertical Bog. Go to Mount Kenya climb via Naromoru route – The 4 Days Mount Kenya Climbing Naro Moru Route Package track starts in Naromoru town and heads past the Park Headquarters up the ridge between the Northern and Southern Naromoru Rivers. At the roadhead is the Meteorological Station, to which it is possible to drive in the dry season. The route drops down into the Northern Naromoru Valley to Mackinder’s Camp on the Peak Circuit Path.
4 Days Mount Kenya Climbing Naro Moru Route Package is the most popular trekking route, with easy access to the start of the route and good facilities on the way up.
Day by day itinerary
1Nairobi - Naro Moru gate to Met Station⌄
Drive from Nairobi to Narumoru gate. From the gate we keep to the park track, which follows the crest of a broad ridge between the Northern and Southern Naro Moru valleys. The going is easy, and it’s pleasant walking through the forest. About two thirds of the way up, after the bridge, there are good views to your left (north), down into the Northern Naro Moru Valley. The track ends at Met Station (3050m). Meals and Overnight will be served at Met Statin.
Meals: Lunch · Dinner
Overnight: Meals and Overnight will be served at Met Statin.
2Met Station to Mackinder’s Camp 10ims, 5-6hrs, 1150m ascent⌄
From Met Station, we head uphill on the track and pass the radio mast on your right after about half an hour. The track turns into a path and after another 30 minutes you’ll reach the end of the”forest belt and enter moorland. This area is called the Vertical Bog; conditions range from them damp to the glutinous depending on when it last rained. Wade through (or hop across tussocks) until the going gets easier and you reach a fork, overlooking then Teleki valley, about 31/2 hours from Met Station. After about 45 minutes you’ll eventually be at Mackinder’s Camp area (4200m). Meals and Overnight will be served at Mackinder’s Camp.
Meals: Breakfast · Lunch · Dinner
Overnight: Meals and Overnight will be served at Mackinder’s Camp.
3Mackinder’s Camp to Point Lenana 4985m, plus descent to Met Station⌄
4km, 31/2-51/2hrs, 785m ascent» plus 14km, 5-6hrs, 1935m descent Today start hiking around 3a.m to get to the summit of Point Lenana by sunrise, or just after, then a walk all the way back down to Met Station on same day. This is long aod hard, and the speed of ascent is one of the major reasons why so many people get sick and don’t enjoy their trek. We therefor recommend by far that you go up in the day light as far as Austrian Hut (4790m) and spend the night of stage 3 there before going up to Lenana next morning.
Meals: Breakfast · Lunch · Dinner
Overnight: night at Mackinder’s after lenana
4Met Station to Park Gate 2600m, descent 13km, 21/2hrs⌄
On this last day we retrace our footstep and down on the path to park gate. Meals and Overnight will be served at our town Hotel or our next destination.
Meals: Breakfast · Lunch
Overnight: No accommodation
What's included
- ✓Bottled water
- ✓Lunch
- ✓Dinner
- ✓Breakfast
Not included
- ✕Alcoholic Beverages
Good to know
Starts: Our Mountain Guide will be there waiting for you with your name written in a banner
Ends: Our Mountain Guide will be there waiting for you with your name written in a banner
Cancellation: For a full refund, cancel at least 24 hours before the scheduled departure time.
- Not recommended for travelers with spinal injuries
- Not recommended for pregnant travelers
- Not recommended for travelers with poor cardiovascular health
- Travelers should have at least a moderate level of physical fitness
From
$750

